Get the risk matrix right for your job

Editing the risk matrix to suit your project is the first thing you should do. These thresholds are what determine the outputs that the model calculates. They should be based on the limits at which work are impacted by weather. For example, not being able to pour concrete below 3 degrees C.

This video guide shows you exactly how to do this:

Steps to navigate:

  • Find the Thresholds tab in the Settings area (bottom left of the screen)
  • Edit each threshold within the EHAB dashboard
  • Or download the excel export to make mass customisations
  • Upload back into the platform

At the start of each project, we reccommend reviewing the risk matrix with the team to ensure the risks in it are correct for you job.

—–

Not yet an EHAB user? Try our platform free today: https://app.ehab.co/register

🔔 Subscribe to our channel for more tutorials, tips, and updates on weather risk management: https://www.youtube.com/@theehabplatform

📚 Check out our blog for more insights: https://blog.ehab.co/

🔗 Connect with us on LinkedIn: https://www.linkedin.com/company/ehabitation

Need further support? We’re here to help: https://ehab.co/contact/

#EHAB #RiskMatrix #ProjectManagement #WeatherRisk #Tutorial #climatechange #weather #construction #innovation #riskmanagement